Audit of ADA-funded projects in Ukraine: what the Austrian Development Agency requires
The Austrian Development Agency (ADA) requires grant financial reports to be verified by an external auditor. This is not an audit with an opinion but an agreed-upon procedures engagement under ISRS 4400 (Revised), based on ADA’s terms of reference. Verification is done for each reporting period. The grant recipient selects and contracts the auditor.

- An agreed-upon procedures report on ADA’s compulsory template: summary information, the sample, each procedure with its finding and amount in EUR, a summary of findings and annexes.
- All financial findings regardless of amount, as the terms of reference require.
- The report in English for the donor and in Ukrainian for the organisation, with findings discussed before issue.
What the donor requires
- Financial reports must be verified by an external auditor for each reporting period (ADA General Terms and Conditions). The General Conditions set no monetary threshold below which verification is waived.
- Format: an agreed-upon procedures engagement under ISRS 4400 (Revised) in compliance with the IESBA Code. The donor does not expect an audit opinion.
- The contract with the auditor must be based on ADA’s terms of reference (Annex E to the grant agreement), which contain the procedures and the report template.
- The auditor must be a member of an IFAC member body, or of a body committed to IFAC standards, or a registered statutory auditor in an EU state or a third country. ADA requires independence: the recipient’s business consultant or tax adviser does not qualify. The team leader needs at least five years of experience.
- The same auditor or firm may verify the project for no more than five consecutive years.
- The default reporting period is 12 months. Reports are due within 2 months after the period and the final report within 3 months, unless the Special Conditions say otherwise.
What the auditor tests: prepare in advance
- The verification covers all project funds, including the own contribution and other donors’ funds.
- Eleven blocks of procedures: financial report, eligibility, staff costs, travel, equipment, project office, sub-grants, contracts and procurement, indirect costs, non-eligible costs, cash flows.
- Sample: at least 65% of expenditure and at least 10% in each budget category. If the exception rate exceeds 10%, coverage is extended to 85%.
- Fieldwork takes place at the implementation locations. A desk review is allowed only in justified exceptional cases.
- If VAT is charged to the grant, the auditor must confirm that the recipient actually bears it. Prepare evidence of your tax status.
- Records are kept for 10 years from the end of the year of the last grant disbursement.
How we run the engagement
ToR review in 1 day
Send us the grant agreement and the donor’s terms of reference. Within one business day we tell you the report format and the timeline.
Scope and proposal
We agree the scope, the document list and the dates with you. A proposal follows once we have reviewed the task.
Fieldwork
We test costs against the budget and the agreement, source documents, procurement, payroll and fund balances. We work remotely and on site across Ukraine.
Report
We discuss findings with management before the report is issued. Reports are prepared in English and Ukrainian. A typical engagement takes two to four weeks.
Audit requirements of other donors
ISA 800/805 plus agreed-upon procedures under ISRS 4400.
Financial audit under ISA 805, CHF 100,000 threshold.
Financial, compliance and performance audit.
ISA 800 and ISA 805, including funds forwarded to partners.
Audited annual project statements, six-month deadline.
Two independent assurance options.
Proof of use of funds and audit.
Grant financial report and pre-submission review.
ISA 805 audit plus ISRS 4400 procedures, 2% materiality.
The donor’s audit right and how to prepare.
Verified by the State Audit Service: deadlines and preparation.
Annual grant audit under ISA 800 with a management letter.
Audit rules for local partners of German donors.
Financial reports and sample audits of grantees.
The agency commissions the audit: how to prepare.
Expenditure verification for EU grants.
GIZ project audit requirements and documents.
Audits, spot checks and micro-assessments under HACT.
More on project and grant audits
Donor-funded, grant and earmarked projects: engagement formats.
Which report the donor needs and how to prepare.
How requirements differ between donors.
What clients ask most often
Is it an audit or agreed-upon procedures?
Agreed-upon procedures under ISRS 4400 (Revised). The auditor performs the procedures in ADA’s terms of reference and reports factual findings, without expressing an audit opinion.
Who selects the auditor for an ADA grant?
The grant recipient. The auditor has to meet the qualification and independence requirements in the terms of reference, and the contract is based on them.
When is the verified report due?
Under the default terms: within 2 months after the reporting period and within 3 months for the final report. The Special Conditions of your agreement may set other dates. ADA pays no more than 90% of the grant before the final report.
Get a proposal