{"id":4894,"date":"2026-11-16T21:53:35","date_gmt":"2026-11-16T19:53:35","guid":{"rendered":"https:\/\/audit-mk.com.ua\/uk\/finansova-model-hrantovoho-proiektu-na-etapi-zaiavky\/"},"modified":"2026-11-16T21:53:35","modified_gmt":"2026-11-16T19:53:35","slug":"finansova-model-hrantovoho-proiektu-na-etapi-zaiavky","status":"publish","type":"post","link":"https:\/\/audit-mk.com.ua\/en\/finansova-model-hrantovoho-proiektu-na-etapi-zaiavky\/","title":{"rendered":"Grant project financial model: why to build it at the application stage"},"content":{"rendered":"<p><\/p>\n<p>A financial model of a grant project is a calculation of where and when the money will come from, what each budget line will really cost including taxes and exchange rates, and how the organisation will cover cash gaps. It should be built at the application stage: under the EU General Conditions for external action grants, indirect costs are capped at a fixed percentage, the contingency reserve may not exceed 5% of direct costs, and without a contract addendum no more than 25% can be moved between main budget headings. Anything not built into the application will later have to be paid from the organisation\u2019s own funds.<\/p>\n<h2>How does a financial model differ from a budget table?<\/h2>\n<p>The donor\u2019s budget table answers the question \u201chow much and for what\u201d. A financial model adds three more: \u201cwhen\u201d, \u201cin which currency\u201d and \u201chow much it really comes to after taxes\u201d. It shows monthly cash flow, the donor and co-financing shares, the tax burden on every payment and the point at which the bank account runs dry if a tranche is two months late.<\/p>\n<h2>How do donor tranches create a cash gap?<\/h2>\n<p>Donors rarely pay the full amount up front. The General Conditions applicable to EU-financed grant contracts for external actions (Annex II, Article 15.1, text: <a href=\"https:\/\/www.eeas.europa.eu\/sites\/default\/files\/e3h2_gencond_en_0.pdf\" rel=\"nofollow\">eeas.europa.eu<\/a>, July 2019 edition) provide that:<\/p>\n<ul>\n<li>for actions of up to 12 months or grants of up to EUR 100 000, the initial pre-financing is 80% of the grant and the balance is paid after the final report is accepted;<\/li>\n<li>for longer and larger actions, pre-financing is paid per reporting period, but the next tranche is reduced if less than 70% of the previous one has been spent;<\/li>\n<li>total pre-financing may not exceed 90% of the grant, so at least 10% is funded by the organisation until the project is closed.<\/li>\n<\/ul>\n<p>Together with co-financing and costs reimbursed only after a report, this is the cash gap. The model should reveal it in advance and show how it will be covered: own reserves, another grant, or staged payments to suppliers.<\/p>\n<h2>What to plan for currency, taxes and co-financing?<\/h2>\n<ul>\n<li><strong>Grant currency and exchange rate.<\/strong> The grant is in euros or dollars, costs are in hryvnias. Under Article 15.9 of the EU General Conditions, costs are converted for reporting at the rate at which the donor\u2019s contribution was recorded in the accounts, unless the special conditions say otherwise. Exchange differences can add hryvnias or eat into the budget. More in our article on <a href=\"\/en\/kursovi-riznytsi-u-hrantovomu-proiekti\/\">exchange differences in a grant project<\/a>.<\/li>\n<li><strong>VAT.<\/strong> The EU treats VAT as an eligible cost only if the organisation cannot recover it (Article 14.2). Registered international technical assistance (ITA) projects in Ukraine benefit from a VAT exemption on supplies paid from ITA funds, but it must be arranged before purchases. Without the exemption, budget prices should include VAT.<\/li>\n<li><strong>Personal income tax, military levy and SSC.<\/strong> Budget the full cost of each payment. Example: if an expert under an employment or civil-law contract is to receive a gross amount of UAH 30 000, the net pay will be UAH 23 100 (18% personal income tax and 5% military levy), and the organisation additionally pays the 22% unified social contribution (SSC), i.e. UAH 6 600. The budget line is UAH 36 600, not 30 000.<\/li>\n<li><strong>Co-financing and in-kind contributions.<\/strong> Under Article 14.9, in-kind contributions do not represent actual expenditure and by default may not be treated as co-financing unless the special conditions allow it. Check the specific donor\u2019s rules before offering \u201cpremises and volunteers\u201d as your share. See our article on <a href=\"\/en\/vnesok-naturoiu-ta-spivfinansuvannia\/\">in-kind contributions and co-financing<\/a>.<\/li>\n<li><strong>Indirect costs.<\/strong> In EU external action grants they are claimed as a fixed percentage of direct eligible costs, within the rate set in the special conditions, usually up to 7%. In Horizon Europe the rate is 25% of direct costs (excluding subcontracting). Accounting, office rent and communications must fit within this limit or be budgeted as justified direct costs, but never in both groups at once. See <a href=\"\/en\/priami-i-nepriami-vytraty-hrantu-rozpodil\/\">direct and indirect grant costs<\/a>.<\/li>\n<li><strong>Project audit.<\/strong> The EU expressly lists audit costs arising from the contract as eligible direct costs. For grants above EUR 100 000 an expenditure verification report must accompany the final report (Article 15.7). If this line is not budgeted, the audit will be paid from own funds.<\/li>\n<li><strong>Contingency reserve.<\/strong> The EU allows a reserve for contingencies and exchange-rate fluctuations of up to 5% of direct eligible costs (Article 14.7), but it can be used only with the donor\u2019s prior written authorisation.<\/li>\n<\/ul>\n<h2>What will the auditor check in a grant financial model?<\/h2>\n<div class=\"mk-table-wrap\">\n<table class=\"mk-table\">\n<thead>\n<tr>\n<th scope=\"col\">Model element<\/th>\n<th scope=\"col\">Question at the application stage<\/th>\n<th scope=\"col\">What the auditor will check<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Tranches and payment schedule<\/td>\n<td>When will money arrive and how will months without a tranche be covered?<\/td>\n<td>Receipts on the project account, reconciliation with the contract, how costs were funded before the tranche<\/td>\n<\/tr>\n<tr>\n<td>Currency and exchange rate<\/td>\n<td>Which rate is used for the budget and the report?<\/td>\n<td>Reporting rate in line with the contract and accounting policy, accounting for exchange differences<\/td>\n<\/tr>\n<tr>\n<td>VAT<\/td>\n<td>Can VAT be recovered, is there an ITA exemption?<\/td>\n<td>That VAT in costs was genuinely not recovered and the exemption was arranged in time<\/td>\n<\/tr>\n<tr>\n<td>Payments to individuals<\/td>\n<td>Are income tax, military levy and SSC included?<\/td>\n<td>Contracts, payroll, tax and contribution payments, consistency with budget rates<\/td>\n<\/tr>\n<tr>\n<td>Co-financing and in-kind contributions<\/td>\n<td>Does the donor accept this contribution and how is it valued?<\/td>\n<td>Supporting documents, valuation, presentation separately from cash costs<\/td>\n<\/tr>\n<tr>\n<td>Indirect costs<\/td>\n<td>What rate is allowed and what does it cover?<\/td>\n<td>Percentage calculated on the correct base, no double counting with direct lines<\/td>\n<\/tr>\n<tr>\n<td>Audit and reserve<\/td>\n<td>Is there a line for audit, is a reserve needed?<\/td>\n<td>Authorisation to use the reserve, contract with the auditor<\/td>\n<\/tr>\n<tr>\n<td>Variations between headings<\/td>\n<td>What is the reallocation limit without an addendum?<\/td>\n<td>Changes within 25% per main heading with the donor informed, larger changes formally amended<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>How we help<\/h2>\n<p>MK Audit has worked with grant projects of NGOs and foundations since 2000. We can review the financial model and budget before you apply and, after implementation, carry out a <a href=\"\/en\/audyt-grantu\/\">grant audit<\/a> to the donor\u2019s requirements. The fee is set in a commercial proposal once the scope of work is clarified. For internal documents of your organisation, use our <a href=\"\/en\/shablony-dokumentiv-ho-bf\/\">document templates for NGOs and charitable foundations<\/a>. Write to us via <a href=\"\/en\/kontaktyi\/\">contacts<\/a>.<\/p>\n<h2>FAQ<\/h2>\n<details>\n<summary>Can audit costs be included in a grant budget?<\/summary>\n<p>Yes, if the contract requires an audit. Under the EU General Conditions audit costs are eligible direct costs, and for grants above EUR 100 000 an expenditure verification report is mandatory with the final report.<\/p>\n<\/details>\n<details>\n<summary>How much can be moved between budget headings without a contract amendment?<\/summary>\n<p>In EU external action grants, up to 25% of each main heading, with written notice to the donor no later than the next report. Indirect costs, the contingency reserve and in-kind contributions cannot be changed this way. Other donors set their own limits, so check your contract.<\/p>\n<\/details>\n<details>\n<summary>Can an expert\u2019s fee be budgeted without taxes?<\/summary>\n<p>No, this is a typical mistake. Budget the gross amount plus the 22% SSC. The organisation withholds 18% income tax and 5% military levy from the gross amount, so the person receives less.<\/p>\n<\/details>\n<p><em>Prepared by the MK Audit team<\/em><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Grant project financial model at the application stage: tranches and cash gaps, currency, VAT, payroll taxes, indirect costs, reserve, what auditors check.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[96],"tags":[305,74,303,304,302],"class_list":["post-4894","post","type-post","status-publish","format-standard","hentry","category-hranty-npo","tag-grant-budget","tag-74","tag-303","tag-304","tag-302"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Grant project financial model at the application stage: tranches and cash gaps, currency, VAT, payroll taxes, indirect costs, reserve, what auditors check.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"admin\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/audit-mk.com.ua\/en\/finansova-model-hrantovoho-proiektu-na-etapi-zaiavky\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"MK Audit\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Grant financial model at application stage\" \/>\n\t\t<meta property=\"og:description\" content=\"Grant project financial model at the application stage: tranches and cash gaps, currency, VAT, payroll taxes, indirect costs\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/audit-mk.com.ua\/en\/finansova-model-hrantovoho-proiektu-na-etapi-zaiavky\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-16T19:53:35+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-16T19:53:35+00:00\" \/>\n\t\t<meta property=\"og:locale:alternate\" content=\"uk_UA\" \/>\n\t\t<meta property=\"og:locale:alternate\" content=\"ru_RU\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/audit-mk.com.ua\/wp-content\/plugins\/mk-landing\/img\/og-default.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/audit-mk.com.ua\/wp-content\/plugins\/mk-landing\/img\/og-default.jpg\" \/>\n\t\t<meta property=\"og:image:alt\" content=\"MK Audit, an audit firm in Kyiv and a full member of DFK International\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Grant financial model at application stage\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Grant project financial model at the application stage: tranches and cash gaps, currency, VAT, payroll taxes, indirect costs\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/audit-mk.com.ua\/wp-content\/plugins\/mk-landing\/img\/og-default.jpg\" \/>\n\t\t<meta name=\"twitter:image:alt\" content=\"MK Audit, an audit firm in Kyiv and a full member of DFK International\" \/>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Grant financial model at application stage | MK Audit","description":"Grant project financial model at the application stage: tranches and cash gaps, currency, VAT, payroll taxes, indirect costs, reserve, what auditors check.","canonical_url":"https:\/\/audit-mk.com.ua\/en\/finansova-model-hrantovoho-proiektu-na-etapi-zaiavky\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":null,"og:locale":"en_US","og:site_name":"MK Audit","og:type":"article","og:title":"Grant financial model at application stage","og:description":"Grant project financial model at the application stage: tranches and cash gaps, currency, VAT, payroll taxes, indirect costs","og:url":"https:\/\/audit-mk.com.ua\/en\/finansova-model-hrantovoho-proiektu-na-etapi-zaiavky\/","article:published_time":"2026-11-16T19:53:35+00:00","article:modified_time":"2026-11-16T19:53:35+00:00","og:locale:alternate":["uk_UA","ru_RU"],"og:image":"https:\/\/audit-mk.com.ua\/wp-content\/plugins\/mk-landing\/img\/og-default.jpg","og:image:width":1200,"og:image:height":630,"og:image:secure_url":"https:\/\/audit-mk.com.ua\/wp-content\/plugins\/mk-landing\/img\/og-default.jpg","og:image:alt":"MK Audit, an audit firm in Kyiv and a full member of DFK International","twitter:card":"summary_large_image","twitter:title":"Grant financial model at application stage","twitter:description":"Grant project financial model at the application stage: tranches and cash gaps, currency, VAT, payroll taxes, indirect costs","twitter:image":"https:\/\/audit-mk.com.ua\/wp-content\/plugins\/mk-landing\/img\/og-default.jpg","twitter:image:alt":"MK Audit, an audit firm in Kyiv and a full member of DFK International"},"aioseo_meta_data":{"post_id":"4894","title":"[:uk]\u0424\u0456\u043d\u0430\u043d\u0441\u043e\u0432\u0430 \u043c\u043e\u0434\u0435\u043b\u044c \u0433\u0440\u0430\u043d\u0442\u0443 \u043d\u0430 \u0435\u0442\u0430\u043f\u0456 \u0437\u0430\u044f\u0432\u043a\u0438 | \u041c\u041a \u0410\u0443\u0434\u0438\u0442[:ru]\u0424\u0438\u043d\u0430\u043d\u0441\u043e\u0432\u0430\u044f \u043c\u043e\u0434\u0435\u043b\u044c \u0433\u0440\u0430\u043d\u0442\u0430 \u043d\u0430 \u044d\u0442\u0430\u043f\u0435 \u0437\u0430\u044f\u0432\u043a\u0438 | \u041c\u041a \u0410\u0443\u0434\u0438\u0442[:en]Grant financial model at application stage | MK Audit[:]","description":"[:uk]\u0424\u0456\u043d\u0430\u043d\u0441\u043e\u0432\u0430 \u043c\u043e\u0434\u0435\u043b\u044c \u0433\u0440\u0430\u043d\u0442\u043e\u0432\u043e\u0433\u043e \u043f\u0440\u043e\u0454\u043a\u0442\u0443 \u043d\u0430 \u0435\u0442\u0430\u043f\u0456 \u0437\u0430\u044f\u0432\u043a\u0438: \u0442\u0440\u0430\u043d\u0448\u0456 \u0439 \u043a\u0430\u0441\u043e\u0432\u0456 \u0440\u043e\u0437\u0440\u0438\u0432\u0438, \u0432\u0430\u043b\u044e\u0442\u0430, \u041f\u0414\u0412, \u041f\u0414\u0424\u041e \u0456 \u0404\u0421\u0412, \u043d\u0435\u043f\u0440\u044f\u043c\u0456 \u0432\u0438\u0442\u0440\u0430\u0442\u0438, \u0440\u0435\u0437\u0435\u0440\u0432 \u0456 \u0449\u043e \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u0438\u0442\u044c \u0430\u0443\u0434\u0438\u0442\u043e\u0440.[:ru]\u0424\u0438\u043d\u0430\u043d\u0441\u043e\u0432\u0430\u044f \u043c\u043e\u0434\u0435\u043b\u044c \u0433\u0440\u0430\u043d\u0442\u043e\u0432\u043e\u0433\u043e \u043f\u0440\u043e\u0435\u043a\u0442\u0430 \u043d\u0430 \u044d\u0442\u0430\u043f\u0435 \u0437\u0430\u044f\u0432\u043a\u0438: \u0442\u0440\u0430\u043d\u0448\u0438 \u0438 \u043a\u0430\u0441\u0441\u043e\u0432\u044b\u0435 \u0440\u0430\u0437\u0440\u044b\u0432\u044b, \u0432\u0430\u043b\u044e\u0442\u0430, \u041d\u0414\u0421, \u041d\u0414\u0424\u041b \u0438 \u0415\u0421\u0412, \u043a\u043e\u0441\u0432\u0435\u043d\u043d\u044b\u0435 \u0440\u0430\u0441\u0445\u043e\u0434\u044b, \u0440\u0435\u0437\u0435\u0440\u0432 \u0438 \u0447\u0442\u043e \u043f\u0440\u043e\u0432\u0435\u0440\u0438\u0442 \u0430\u0443\u0434\u0438\u0442\u043e\u0440.[:en]Grant project financial model at the application stage: tranches and cash gaps, currency, VAT, payroll taxes, indirect costs, reserve, what auditors check.[:]","keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":0,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2026-11-16 19:53:35","updated":"2026-11-16 19:53:35","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/audit-mk.com.ua\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/audit-mk.com.ua\/en\/category\/hranty-npo\/\" title=\"Grants and NGOs\">Grants and NGOs<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tGrant project financial model: why to build it at the application stage\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/audit-mk.com.ua\/en\/"},{"label":"Grants and NGOs","link":"https:\/\/audit-mk.com.ua\/en\/category\/hranty-npo\/"},{"label":"Grant project financial model: why to build it at the application stage","link":"https:\/\/audit-mk.com.ua\/en\/finansova-model-hrantovoho-proiektu-na-etapi-zaiavky\/"}],"_links":{"self":[{"href":"https:\/\/audit-mk.com.ua\/en\/wp-json\/wp\/v2\/posts\/4894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/audit-mk.com.ua\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/audit-mk.com.ua\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/audit-mk.com.ua\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/audit-mk.com.ua\/en\/wp-json\/wp\/v2\/comments?post=4894"}],"version-history":[{"count":0,"href":"https:\/\/audit-mk.com.ua\/en\/wp-json\/wp\/v2\/posts\/4894\/revisions"}],"wp:attachment":[{"href":"https:\/\/audit-mk.com.ua\/en\/wp-json\/wp\/v2\/media?parent=4894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/audit-mk.com.ua\/en\/wp-json\/wp\/v2\/categories?post=4894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/audit-mk.com.ua\/en\/wp-json\/wp\/v2\/tags?post=4894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}